Option System + Master Sets |
You can collect materials for the differential bill of materials during option group solving. Collecting materials may increase the time required for solving.
Set Up Option
Configurations Dialog Box
Selecting Option Groups to Be
Solved And Drawings to Be Created
Solving and Updating an Option
Configuration
Printing a Differential
BOM
Converted from CHM to HTML with chm2web Pro 2.85 (unicode) |