Drawing Schedule

You can create a drawing schedule of the project drawings, either in a text file or an Excel worksheet. The schedule data is collected from the project's FILEINFO database, in which the design data of the drawings is defined.

  1. Do either of the following:
  2. If necessary, edit the data in the Drawing Schedule database view. The changes will only be saved in the drawing schedule, not the FILEINFO database.
  3. Confirm by clicking OK.
  4. Select the file format from the list:
Note

Document Information
Drawings
Project Document Browser

Converted from CHM to HTML with chm2web Pro 2.85 (unicode)