Update the Profile Schedule
Click Beams, Columns > Update Schedules to update
the following changes in the profile schedule added to the floor
plan:
- Where you have added or deleted a profile.
- Where you have changed the length, cross section or other
listed property of a profile.
- Where you have edited the drawing properties of the lists in
the system settings.
The function updates all the lists in the drawing-model pairs in
the project that list the profiles of a specific group such as
BEAMS, COLUMNS, FLOOR JOISTS, etc. A list containing the profiles
the user has selected individually is not updated.
Note
- By default, the function also updates the profile codes when
you add or delete a profile. Updating the codes is defined in the
system settings with the keyword
upd_pce_labels_during_schedule_upd.
- upd_pce_labels_during_schedule_upd = 0 - The codes are not
updated.
- upd_pce_labels_during_schedule_upd = 1 - The codes are
updated.
- Updating the codes in connection with solving options is
defined in the system settings with the keyword
upd_piece_schedules_during_testing.
- upd_piece_schedules_during_testing = 0 - The user is asked if
the schedules are updated when the options are solved.
- upd_piece_schedules_during_testing = 1 - The schedules are
updated when the options are solved. Default value.
- upd_piece_schedules_during_testing = -1 - The schedules are not
updated when the options are solved.
Profiles