Fill in the project data

  1. Fill in some fields on the Project Data tab of the Project Data Card dialog box. It is not necessary to fill in all of the fields. For example, type Tutorial exercise in the Description field.

    Note: The figure above shows the project data card included in the basic software delivery. If you are using a custom fitted version of the software, your project data card may look different. Just fill in the fields you desire.

  2. Accept the data by clicking OK.

    The first drawing-model pair of the project is activated. The drawing file of the drawing-model pair is opened in the drawing window and the model file in the model window. The project document browser is opened on the left side of the workspace.

Note: Depending on the localization and custom fitting, it may be necessary for you to select the first drawing-model pair to be activated from a button menu. Select the drawing-model pair intended for the wall layout of the first aboveground floor. The name of the drawing-model pair also depends on your localization and custom fitting.

 

Converted from CHM to HTML with chm2web Pro 2.85 (unicode)